Jeg sidder med en opageve i operationsanlyse der handler om at opstille et lineært problem, udfra informationerne i teksten.
Jeg kan ikke rigtige gennemskue hvordan den skal stilles op:
Den skal bare opstilles på almindelig standard form dvs.:
maximize: c1x1+c2x2+...+cnxn
subject to: a11x1+a12x2+....+a1nxn ≤ b1
a21x1+a22x2+....+a2nxn ≤ b2
osv.
Opgave:
A steel company must decide how to allocate next weeks time on a rolling mill, which is a machine that takes unfinished slabs of steel as input and can produce either of two semi-finished products: Bands and Coils. The mill's two product come off the rolling line at different rates: Bands: 200 tons/hr and Coils: 140 tons/hr.
They also produce different profits: Bands: $25/ton and Coils: $30/ton
Bases on a currently booked orders, the follow upper bounds are placed on the amount of each product to produce:
Bands: 6000 tons and Coils 4000 tons
Given that there are 40 hours of production availble this week, the problem is to decide how many tons of bands and how many tons of coils should be produced to yeld the greatest profit. Formulate this problem as linear programming problem.
Jeg tror umiddelbart min max funktion bliver: 25*200x1 + 30*140x2 = 5000x1+4200x2
Jeg har dog svært ved at se hvordan begrænsninger skal stilles op.
Håber der er nogen som kan hjælpe.
Svar #1
13. februar 2012 af nielsenHTX
mit bud ville være </o:p>
x1=Bands </o:p>
x2=Coils</o:p>
profitten for en times arbejde må være det du også selv er kommet frem til så: </o:p>
max 25*200x1+30*140x2 </o:p>
s.t x1 ≤6000 Bands: 6000 tons </o:p>
x2 ≤ 4000 Coils 4000 tons </o:p>
x1+x2 ≤40 40 hours of production available this week</o:p>
Skriv et svar til: Lineær Programmering
Du skal være logget ind, for at skrive et svar til dette spørgsmål. Klik her for at logge ind.
Har du ikke en bruger på Studieportalen.dk?
Klik her for at oprette en bruger.